ningbo at a glance: the north-k8凯发官网
the north-south xihong bridge and its connecting roads link huanzhen north rd of gaoqiao, haishu and the north ring road in jiangbei. built with 3.52 billion yuan of investment, the total length of the new bridge and road is 4.5 km. currently, the above-water steel girders are being installed. the main deck will be completed by november 2021. the construction of all main structures will be completed before the end of the year. the bridge and road are expected to open by late 2022.
by chen jinhui
video: yanghui, pan wenjie (intern)
narration: pan wenjie (intern)
editor: li xiaoying
senior editor: lei junhu
editorial director: du chunjing
chief editor: ge ying
english corner
2021-06-18 21:42:22